
Countertop installation
Quartz and Granite Countertops in Dallas, TX
New counters are where a kitchen remodel starts to look finished. We help you pick the slab, template the tops on site once the cabinets are level, and install them with tight seams and clean sink cutouts.
- 4925 Greenville Ave #290, Dallas
- (469) 352-9893
- Quartz, granite, quartzite
- Templated on site
- Sink and cooktop cutouts
- Free In-Home EstimatesWe measure your kitchen in person.
- Design to InstallOne team from the first sketch to the last pull.
- Permits PlannedWe list the permits your city needs up front.
- Open 24 HoursCall or send the form any time, any day.
Countertops
Which Countertop Should You Choose?
For most Dallas kitchens the choice comes down to quartz or granite. Quartz is engineered stone: crushed quartz bound with resin into a slab with an even color and pattern. Granite is natural stone cut from the quarry, so every slab is different.
Quartz doesn't need sealing and resists stains. Granite handles heat better and has the movement only natural stone has, but it should be sealed. Quartzite is the third option for people who want a white, veined natural stone that's harder than marble.
Whatever you pick, the install matters as much as the slab. Tops are templated on site after the base cabinets are set, so the template matches the real walls, not the drawing.
Material by material
Quartz, Granite, Quartzite and Porcelain Compared
Each material does something better than the others. This is how they line up on the things people ask about most.
| Material | What it is | Care | Watch for |
|---|---|---|---|
| Quartz | Engineered: crushed quartz and resin | No sealing, wipes clean | Hot pans can mark the resin, so use trivets |
| Granite | Natural stone, every slab unique | Seal it now and then | Seams show more on busy patterns |
| Quartzite | Hard natural stone, often white | Seal it now and then | Some stone sold as quartzite is softer and can etch |
| Porcelain slab | Fired ceramic in thin, large slabs | No sealing | Thin edges, so chips at corners need care |
Want the long version? Our guide on quartz vs granite countertops walks through cost, heat, stains and resale.

Pick your slab
See the Actual Slab Before It's Cut
A sample the size of your hand doesn't show how a granite or quartzite slab moves. Before your tops are cut, you can see the full slabs at the stone yard and mark the ones you want, so the veining lands where you'd like it on the island.
Quartz is more predictable, but large patterns still have a direction. We lay out seams and the waterfall so the pattern runs on, not across.
What we plan before the cut
- Where the seams fall, away from the sink and cooktop.
- Which way the veins run on the island and waterfall ends.
- Overhang for stools, usually with support brackets.
What's included
What Goes Into a Countertop Install?
A countertop job is mostly measuring and planning. The install day is the short part.
Templating
A template of every top is made on your level cabinets, with sink and range locations marked.
Seam Layout
Seams are placed where they show least and hold best, never over the dishwasher.
Setting the Tops
Tops are set level and bonded, and seams are filled and polished to match.
Sink and Faucet
The undermount sink is mounted and the faucet goes back in for the plumber to connect.

How it works
How a Countertop Installation Works
From picking the slab to the first coffee on it, a countertop job runs in four steps.
Step 1: Pick the Material
We bring samples to your kitchen and help you choose by look, care and budget.
Step 2: Template
Once the cabinets are set, the tops are templated in the room.
Step 3: Fabrication
The slab is cut, edged and polished at the shop from the template.
Step 4: Install
Tops go in, seams are finished and the sink is ready to hook up.
Safer cutting
Why We Keep Stone Cutting Out of Your Kitchen
OSHA and NIOSH warn that cutting and grinding stone countertops releases crystalline silica dust. Engineered quartz is over 90% silica, so most cutting belongs at the shop.
Cut at the Shop
Sink cutouts and edges are done at the fabrication shop, not on your counters.
Wet Cutting On Site
Any small trim cut on site is done wet or with a dust shroud and vacuum.
Finished Tops Are Safe
The dust risk is from cutting. A finished, installed counter doesn't release silica.
Cost
What Do New Countertops Cost?
Countertop prices are set by the square footage of stone, the material and slab you choose, and the fabrication: edge profile, sink and cooktop cutouts, and any waterfall ends or mitered edges.
A plain quartz top with an eased edge costs less than an exotic quartzite with a mitered waterfall. Removing old tile or stone tops adds to it. We give you a firm price once we've measured and you've picked the slab.
Quartz vs granite countertopsWhat moves the price
- Square feet of stone
- Material and slab
- Edges and waterfalls
- Cutouts and sinks
What's changing in your kitchen?
Your kitchen plan
2 changes, which means a licensed plumber and a licensed electrician under Texas law.
New cabinets
The old boxes come out, the walls and floor are checked for level, and the new cabinets are set, shimmed and fastened.
Permits: Swapping cabinets in the same layout is usually treated as cosmetic work. Changing the layout can bring in plumbing or electrical permits.
New countertops
Stone and quartz tops are templated after the base cabinets are set, then cut at the shop and installed. The sink and cooktop go back in after.
Permits: Countertops alone rarely need a permit. Reconnecting the sink is plumbing, which Texas licenses through the State Board of Plumbing Examiners.
Reface the cabinets
The cabinet boxes stay. New doors and drawer fronts go on, and the frames and end panels get a matching veneer.
Permits: Refacing is cosmetic work and doesn't usually need a permit in Dallas or the suburbs.
Backsplash tile
Tile goes up after the counters are in, so it can sit tight to the top. Outlets in the backsplash get box extenders.
Permits: Tile on its own usually needs no permit. Moving or adding outlets is electrical work, which Dallas requires a licensed electrician to do.
Add an island
The island is laid out against walkways and appliance doors, then built on the floor and anchored.
Permits: An island with a sink or outlets needs plumbing and electrical permits, pulled by the licensed trades doing the work.
Move the sink or range
Moving a sink, dishwasher or gas range means new supply, drain, vent or gas lines run through the walls or the slab.
Permits: Plumbing and gas lines need a permit and a Texas-licensed plumber. Many Dallas homes sit on a slab, so moving a drain can mean cutting concrete.
Open or move a wall
We find out first whether the wall carries load. A bearing wall needs a beam sized for the span before it comes out.
Permits: Removing or moving a wall needs a building permit, and a load-bearing wall usually needs engineered plans.
Home built before 1978
Painted trim, plaster and old cabinets can hold lead paint, so painted surfaces are tested before demolition.
Permits: The EPA's lead rule, which the EPA runs in Texas, covers paid work that disturbs more than 6 square feet of paint inside a pre-1978 home.
Your city or town's building department makes the final call on permits. We confirm the list at the estimate.
Related services
Other Kitchen Work We Do
Counters sit on cabinets and under tile. These are the jobs that usually go with them.



Custom Kitchen Cabinets
New cabinets built before the tops are templated.
- Built to size
- Full installation
Where we work
Countertops Across Dallas and the Suburbs
We install quartz, granite and quartzite countertops in Dallas and these cities.
Asked often
Countertop Installation Questions
Is quartz or granite better for a kitchen?
Quartz is easier to live with: no sealing and very stain resistant. Granite handles heat better and every slab is unique. Our guide compares quartz vs granite countertops in detail.
Can new countertops go on my old cabinets?
Often, yes, if the cabinets are sound and level. We check them at the visit. Stone is heavy, so weak or out-of-level boxes need fixing first.
How long are we without a sink?
From when the old tops come off until the new ones are set and the plumber reconnects the sink. We schedule templating and install to keep that gap short.
Is the dust from cutting quartz dangerous?
Breathing the dust from cutting or grinding stone is a known risk for workers, which is why most cutting happens at the shop. A finished, installed counter is safe.
Do you remove the old countertops?
Yes. We take out old laminate, tile or stone tops and haul them away before the new ones are templated.
Free in-home estimate
Get a Free Countertop Estimate
Tell us the material you're leaning toward and roughly how much counter you have. We'll bring samples to the visit.
- Free in-home estimate
- Your kitchen measured in person
- A written scope before any work starts